Power Station

"“We have had great success with the overall durability and maintenance of the screens. The Hydrolox screens have only required minimal preventive maintenance, which has allowed us to operate more efficiently, and has lowered O&M costs for this equipment."

Senior Maintenance Specialist

Company

Power Station

Project

Alabama, USA

Application

Power & Industrial

Challenges

Screens had to be rebuilt every 3-4 years

Excessive preventative maintenance

Operated intermittently, not compliant with 316(b)

Results

Annual savings of more than $200,000

89% reduction in work hours annually devoted to maintenance

Operates 24/7 to enable 316(b) compliance

Download Project